Pakistan State Oil (PSO)
Project Name: 02 Nos. 31,000 MT Steel Storage Tanks (57 M Dia, PMG Tank) on EPC basis at PSO Zulfiqarabad Oil Terminal, Port Qasim, Karachi.
Pak-Arab Refinery Company Limited (PARCO)
Project Name:
Design, Field Engineering, Procurement, Construction, Erection, Installation. Testing, Commissioning Including Civil Work, Tank Foundation, Allied Structure, Piping Work, Installation of Equipment, Fire Fighting System, Complete Turn-key Work, Start-up and Handover of MFM MOGAS Project (MFM-MP), Phase-I at Machike, Faisalabad, Mahmood Kot Storage Terminal.
Pakistan State Oil (PSO)
Project Name:
Rehabilitation of 5500 MT Vertical Storage Tank # 201 AT PMY
Tank size: 24.40 meter dia. x 12.9 meter height.
Client: China Petroleum Pipeline Bureau
Project Name: Construction Work For Machike Station (TS-4) Including Civil Work, Allied Piping, Installation of Equipment, Surface Preparation, Painting, Firefighting Hydro Test, Testing & Commissioning of MFM MOGAS Project (MFMMP), Phase-II.
Client: Pakistan State Oil (PSO)
Project Name: 02 Nos. 31,000 MT Steel Storage Tanks (57 M Dia, PMG Tank) on EPC basis at PSO Zulfiqarabad Oil Terminal, Port Qasim, Karachi.
Client: Pak-Arab Refinery Company Limited (PARCO)
Project Name:
Design, Field Engineering, Procurement, Construction, Erection, Installation. Testing, Commissioning Including Civil Work, Tank Foundation, Allied Structure, Piping Work, Installation of Equipment, Fire Fighting System, Complete Turn-key Work, Start-up and Handover of MFM MOGAS Project (MFM-MP), Phase-I at Machike, Faisalabad, Mahmood Kot Storage Terminal.
Client: Pakistan State Oil (PSO)
Project Name:
Rehabilitation of 5500 MT Vertical Storage Tank # 201 AT PMY
Tank size: 24.40 meter dia. x 12.9 meter height.
Client: China Petroleum Pipeline Bureau
Project Name: Construction Work For Machike Station (TS-4) Including Civil Work, Allied Piping, Installation of Equipment, Surface Preparation, Painting, Firefighting Hydro Test, Testing & Commissioning of MFM MOGAS Project (MFMMP), Phase-II.